How Latitude Came to Be.

 
Scan12.jpg

Hull Planking

Cold mold design

Philippine mahogany, West system epoxy with bronze ring shank nails.

 
Scan10.jpg

Build it.

It all begins with a dream!

JQVX4120.JPG

Pressure testing the fuel tanks..

JLRL6627.JPG

Fuel tanks going in..

1.JPG

Engine ready!

2.JPG

Engine going in!

3.JPG

Almost there!

6.jpg

Easy does it!

5.JPG

It’s in!

8.jpg
10.JPG

Building Latitude

A Passion Project comes to Life.